For subcontractors and specialist contractors

Find the holes in your quotation before the main contractor does.

Workflow tools track your compensation events. Clause 60 tells you whether they will hold up.

You are working under an NEC subcontract, the events keep coming, and every quotation you submit is going to be assessed by somebody looking for a reason to cut it. Clause 60 reads your quotation, your cost build-up, your subcontract and your programme, and tells you where it is weak while you can still do something about it.

The two moments this is for

Before you submit

A quotation that goes in with an arithmetic error, the wrong cost basis for the Option, or a delay that the programme does not actually support hands the assessor a reason to reduce it. Clause 60 goes through it first, so what you send is the version you would want to defend.

It also shows you where the money may be missing. Preliminaries and time-related cost on an event that moves the Completion Date. A fee percentage left off, or the wrong one applied. An item priced from tender rates when the subcontract says Defined Cost. Risk that belongs in the quotation and was never allowed for. These are not exotic — they are the things a rushed quotation leaves behind, and once it is accepted they are gone.

When the assessment cuts you

The main contractor makes its own assessment and your quotation comes back reduced. The question is not whether you are annoyed, it is whether the cut is actually supported by the subcontract — and you usually have very little time to work that out.

Run the original quotation and the assessment through together. The review sets out, clause by clause and line by line, where the reduction has a contractual basis and where it does not, with every point cited to the document it came from. That is the difference between a reply you can stand behind and a phone call that goes nowhere.

And before either: when you price the subcontract

Most of the compensation events that go wrong were lost at tender, in a subcontract nobody had time to read properly: a rewritten time bar, a deleted compensation event, payment that waits on the main contractor being paid. A tender review sets out every amendment to the standard ECS, rated from your side and quoted from the subcontract, before you put a price on it. £149, first review free by invitation.

Request a tender review →

What it actually checks

AreaWhat the review does
Your subcontract Reads the form you are actually working under, including the Z-clauses and amendments, rather than assuming the standard wording. Whether the event qualifies, under which clause, and what your contract has done to it.
The cost build-up Re-sums it, tests rates against the Contract Data, checks the basis of assessment against the Option in use, and flags double counting between the build-up and the fee.
The time claim Where a native programme is available, opens it: logic links, float, Key Dates and Sectional Completion, and whether the delay you are claiming genuinely moves a contractual date.
Consistency Whether your narrative, your build-up and your programme tell the same story. They often do not, and it is the first thing a good assessor notices.
What is missing Anything that cannot be verified from the documents you supplied is flagged as unverified rather than assumed. You get a list of what to go and find.

If you do not use Primavera

Plenty of subcontractors programme in Microsoft Project or Asta Powerproject, and plenty receive nothing but a PDF of the main contractor's programme.

Microsoft Project now works. Clause 60 reads Project programmes directly, and runs the same analysis it runs on a Primavera file: the logic links, the float, and whether a claimed delay actually moves a contractual date or is absorbed. One practical note — Project's own .mpp is a binary format that nothing can read, so export it first (File → Save As → XML) and upload the .xml.

Asta Powerproject exports that same XML, so we expect it to work by the same route — but no real Asta file has been through it yet, and we would rather say so than let you find out. If Asta is what you use, tell us when you get in touch: we will run yours and give you the answer either way, before you commit to anything.

And if all you have is a PDF of someone else's programme, you still get the full contractual and cost review — which is where most of the money sits — and the time section tells you plainly what could not be tested rather than guessing.

Why a subcontractor can put their name to it

What it found on nine live events

Paul Mulcair UK Ltd, a drainage subcontractor on a major UK rail programme, put nine priced NEC3 compensation events through Clause 60. One quotation added up perfectly and still left a priced line, 12.5% of the event, uncharged. Others carried duplications the other side's assessor would have found first.

Read the PMUK case study →

Built by someone who has sat on both sides

Clause 60 is built by a chartered commercial manager with twenty years of NEC assessment, including on the £4bn Transpennine Route Upgrade. The checks in the review are the ones that come up again and again in practice — which is also why the report reads like a commercial review rather than a printout.

A second opinion on your worst one

Send me your most contentious live compensation event. I will run it through Clause 60 and walk you through what it finds, in twenty minutes. No charge.

Not a demo of the software — a second opinion on your own money, from someone who has assessed these for twenty years. You get the report either way, and if it turns out there is nothing in it, that is a useful answer too.

Two practical things. Nothing is uploaded until a data processing agreement is signed — it is one page and it goes out the same day, because the documents belong to your client, not to you. And I can take a couple of these a week, so if the diary is full I will say so rather than keep you waiting.

Would rather look first? The demo runs a complete review on a sample event with no sign-up, no upload and no call. Ready for more than one event? How a pilot works →

Or ring me on 0330 088 3390 — you will get me, not a switchboard.